You can migrate data from an old system to a new one without losing anything by profiling it first, rehearsing the move several times and reconciling the totals before the old system is switched off. Putti, an Auckland software company, treats migration as its own workstream with its own sign-off.
Where does data actually get lost in a migration?
In the mapping, not the copying. Copying a table from one database to another is mechanical. The risk sits in deciding what each old field means in the new system, and old systems are full of fields that mean three things at once.
A column called notes2 that three people fill in differently. A customer type of "X" that someone invented in 2016 and nobody documented. A date stored as text, in two formats, depending on which screen the user entered it on. None of that breaks the copy. All of it breaks the new system a month later, when a report comes out wrong and nobody can say why.
What should happen before any data moves?
Profile the old data first, then decide the target. That means pulling a real extract and counting: how many records, how many duplicates, how many blank required fields, how many dates in the future. The numbers are rarely flattering, and the earlier you have them the cheaper they are.
We write the findings into a mapping sheet that your team can read. Every old field gets a row: where it goes, how it's converted, and what happens to values that don't fit. Someone from your business signs it off, because they're the ones who know whether "X" means a wholesale customer or a mistake.
This is also the point to decide what not to move. Ten years of closed quotes may be worth archiving rather than loading into a system your staff will use every day.
Why do you run the migration more than once?
Because the first run always finds something. We run the full migration into a test copy of the new system as a rehearsal, check the results, fix the rules and run it again. A third or fourth pass usually runs clean, and that's the one you want to go live on.
Each rehearsal teaches something different. The first exposes records that fail validation. The second shows whether the numbers add up. The third is where your own staff open the new system and tell you what looks wrong, which is the most valuable check there is.
By cutover day the migration should be boring. If it's exciting, it hasn't been rehearsed enough.
How do you prove the data is complete?
Reconcile it two ways, with totals and with people. Totals come first and they're automatic: record counts per table, the sum of open invoices, stock on hand by location. If the old system says $1,284,310 owing and the new one says $1,284,015, you have a $295 problem to find, and you find it while nothing depends on the new system yet.
Then a person who knows the data opens real records. Their ten largest customers, last month's busiest day, an order with an unusual history. Totals catch missing rows. People catch rows that arrived but now mean something different.
How do you cut over without stopping the business?
Move the bulk early and the last few days late. The history, which is most of the volume, migrates ahead of time and gets verified. On cutover day only the recent changes move, so the final pass takes hours instead of a weekend.
The old system stays in place and stays readable until your team has used the new one for real and signed off the figures. If something turns up, there's still a source to check it against. That's the same staged logic we use when replacing a legacy system one piece at a time: you never depend on something that hasn't been proven.
If the two systems have to run side by side for a while, a systems integration layer keeps them in step so nobody types a record twice.
Does the Privacy Act change how you migrate?
Yes, in a few practical ways. Personal information has to stay protected while it moves, so extracts shouldn't sit in someone's downloads folder or an unencrypted email attachment. Test copies of the new system shouldn't hold real customer details unless they're secured to the same standard as production. And a migration is a good moment to ask whether you still need records you're only keeping out of habit.
We'd rather settle those questions in the mapping sheet than discover them after a staff member has a spreadsheet of customers on a personal laptop.
What if the old system's developer has gone?
It's workable if you can reach the database. The data tells the story even when the documentation doesn't: table structures, relationships and a few thousand real records show how the system behaved. If you can't find the developer, our guide to taking over a project when the developer disappears covers what to secure in the first fortnight.
Talk to Putti about migrating your data
When Auction Online's vehicle auction platform moved to its rebuilt system in September 2026, we carried its existing user list across and invited every dealer in, so nobody had to find their own way onto the new platform. Each change was signed off on staging before it went live.
That's one of 100+ projects Putti has delivered since 2010, with zero failures, for clients including Spark, Hilton and Fletcher Building. Every person on the work is a Putti employee led by senior engineers in Auckland, and none of it is outsourced or subcontracted.
Leaving a system that holds years of records? Talk to us about a data review before you commit to a cutover date.